Those projects are perpetual, but that’s ok. You’re just too handy and can do them Steve!
I got my other knee done today, and hopefully in 3 weeks I can ride my ATV across the ice to the cabin. Plan is to haul supplies up the hill from the lake as I’m tired of climbing that hill. If that doesn’t work, I’ll tie the two canoes together and load the ATV on them. Tow it across the lake like I did with all the large lumber and doors. Still 3 ft. of ice so I have a little time yet!
Sent from my iPhone using Tapatalk