stihl_head1982
Here long time
- Local time
- 5:29 PM
- User ID
- 168
- Joined
- Dec 24, 2015
- Messages
- 4,153
- Reaction score
- 14,549
- Location
- USA

View attachment 42101 Some pics @srb08 ...Steve...taking a methodical approach at making this smoker right. First of all, casters are a must. Had stem, 3" casters in my shop...worked perfect. When I drilled the holes in the 'triangle', started with a 1/4, then 3/8, then 1/2"....you'll figure it out real quick within the piss poor press brake and where the half triangles, and tacked with a piss poor spot weld, meet with their stagger. Drill it fast so you can overcome the 'upper snag of metal not lining up.'
I used the Sil Bond, Silco, to put the lower burn chamber to the bottom of the upper smoke chamber cabinet. Take a look at the stack as well...had to seal mine from the underneath side to the flange where the little piss poor tack welds are, then I sealed it when inserted from the cabinet up with another bead.
I'll lay the gasket on the main cabinet door here directly. The 3" casters added to the height...top of the cabinet now with the 3" casters roughly 59 1/2" inches. I guess the factory specs took into consideration the taller stack/chimney. It now sets about 63-64" to the top of the stack.
Here's some pics so far...
View attachment 42094
View attachment 42100
PROGRESS!
I love it!
Keep the updates coming!