The boiler is installed, gas hooked up, and the building is now heated via radiant heat in the floor. Since so much time had passed between laying the tubing and finally getting things hooked up it took a few attempts before they got the zone valves connected to the correct thermostats...then they had to learn some details of the communication between the wireless sensors and the thermostats...but now it seems to be sorted out.
View attachment 483195
View attachment 483193
Last week the contractor installed the hoist, now I need to come up with a pallet or a box to facilitate moving the larger, heavier items up to the second level.
View attachment 483196
View attachment 483198
The contractor also put up some shelving in the storage area over the covered parking at the rear of the building. There is enough room to put the tote 2 deep on the bottom but for now I have enough space. I suspect it will eventually fill up given the amount of stuff in the other attic and still in my garage.
View attachment 483192
Mark