Al Smith
Here For The Long Haul!
- Local time
- 3:18 PM
- User ID
- 537
- Joined
- Jan 14, 2016
- Messages
- 6,635
- Reaction score
- 14,773
- Location
- North western Ohio
If I'm not mistaken the R440 is an earlier version of a P-100 .
After 50 years, sealants may leak a bitin addition, there is a hole in the crankshaft and the saw runs poorly or does not rev at all
I will check it and let you knowNigdy nie uważałem dziury za problem, poza tym, że utrudnia sprawdzanie, czy uszczelki itp. są dobre. Stały wyciek powietrza można wyeliminować i nie wpłynie to na działanie pił. To te nagłe przypadki dopadają. Dlatego lubię mtronic i autotune, ponieważ mogą uratować i uratowały wiele pił
Thank you for sharing. That chainsaw is indeed super. Is there anyway you can post pictures of the old factory? Do you know any locals that used to work at the partner factory before the take over?Here are picture of a Partner P100 SUPER 100cc/3 Cubic inch. This must be the last version from
Partner. Maybe made around 1981-82. It's the same saw on all pictures. But I just did buy this Partner P100 SUPER from Belgium. And I am from Sweden and live in the same area where the original factory was. About the same distance to old Jonsered Chainsaw plant. Swedish brand Husqvarna did buy Partner and Jonsered. All production is long gone from the Gothenburg-Mölndal-Jonsered Area. But what was left behind in Jonsered was resurge and development engineering department. From what I have heard there is no chainsaw testing in Jonsered. I think GPS lawn mover or other "useless" stuff. I now this is about Partner chainsaw. But I can mention that Husqvarna will have started production of there new fuel injected chainsaw the 564 XPG FI it's about 60cc...got the strocke of a 50cc and piston size of a70cc saw. Light as possible is what the goal.
Magnus has a thread about the history of this companyThank you for sharing. That chainsaw is indeed super. Is there anyway you can post pictures of the old factory? Do you know any locals that used to work at the partner factory before the take over?




