I'm mostly over it.  I just figure every new rule, procedure, or over-engineered hoop I have to jump through is time spent not repairing machines and making schedule, which is made up eventually on time and a half or double time.  So their dumb *s-word = more doll hairs in my pocket.
The latest exapmle:  Our leak test area burns through a ton of orings every day.  I have a compartmentalized tackle box thing I keep stocked.  We recieve the rings from the manufacturer in pre-packaged baggies with a quantity on the bag that I check out from our supply crib.  Some are 50 to a bag, some sizes are 300.  Come the end of the fiscal year they decided they didn't want us to check out more than 100 at a time.  That just tells me they're fine with ultimately paying my happy ass 1.5 or 2 times my hourly to count things.  So i count them.  Every.  Single.  Time.