Have to get away for some loud ass saw testing somewhere other than home. 084s and 361s, again

Next trip is the same with a 046 tossed in.
When they come off the mill after run in... I'm sure they are ready to go to their new home. No small or giant trees to cut down but one fat ass cherry, 4' x 5' base. Just the base is there. These guy already chopped them down to ten foot tall. 27 foot burl log there to. Nice to actually have two big cherry trees one at home and one near by. The one near by just needs a 66 wif a 32" to get it knocked over for the mill.
Just one day this week chunking for the camp ground, all yellow pine, all messy. He already cropped the tops with a little lift last week. Easy day for me. Red cedar there also

and big spalted pines to 3'x21' down in the back just waiting for me to slab.
The weather has been pretty damn good this month here. Pine barons is a bit dry to real dry in the north end. Fire hazard imo.
Bought some of those 10x10 pop-up canopies last fall to work under. Will be out milling. No sun, no rain...
Who's chainsaw milling logs this summer?