Morning men. Headed to town to pick up a few supplies for the kitchen remodel. I haven’t posted much about it and awful for no documenting projects, lol. I went to the studs and joists. I had to plane a few and sister the low ones. I replaced one that had a gnarly knot I didn’t like the look of. New duct work insulation since I was right there, new flex to the register boots, new plumbing roughed in and vent stack. I added blocking for the cabinets and made sure my studs were all on plane for new drywall. I replaced all the boxes with adjustable ones since the wife hasn’t decided whether we are tiling the backsplash or not. Ran new wire from each box. I have the can lights, but may do wafer lights instead. The issue is we have 1/2” drywall on top of old lathe/plaster ceilings. With cans, I can just pop some screws in to hold them. I’m not sure how the wafer lights will hold if the clips don’t lay flat. I plan on hanging drywall today when I get back and cabinets next week while the kids are home for fall break. Have a good day gentlemen.