I've been slacking on my progress reports. After several attempts the concrete floors are done, grind and seal up front and solid color (light grey) in the shop at the back.
Mini Splits (heat pumps) were installed in early December, the boiler for the radiant floor heat is supposed to arrive soon but heating has been solely electric heat pumps for past 30+ days. Electrical bill was $147...
Railing for the stairway was test fit today.
View attachment 479679
Interior doors and trim has arrived and the contractor was working on getting them installed today.
View attachment 479680
View attachment 479681
I did get a clock for Christmas and have it installed in the new display room.
View attachment 479682
Mark