High Quality Chainsaw Bars Husqvarna Toys Hockfire Saws

Not So Pro 3

Agent Smith

Hack of all trades
Local time
9:01 AM
User ID
5180
Joined
Jan 28, 2018
Messages
3,168
Reaction score
18,933
Location
Northeast ohio
Country flag
wood shed ?
Yep. Have grown very tired of tarps.

That's gonna be cool.
I'm really looking forward to the finished product. Really underestimated the amount of work that goes into a log anything structure. The guys building log cabins by hand.... much respect
 

Mastermind

Chief Cat Herder
Staff member
Yearly GoldMember
Local time
8:01 AM
User ID
4
Joined
Dec 3, 2015
Messages
52,547
Reaction score
350,003
Location
Banner Springs Tennessee
Country flag
Really underestimated the amount of work that goes into a log anything structure. The guys building log cabins by hand.... much respect

I built an 11,000 square foot log home about 20 years ago. It had 13 tractor-trailer loads of logs in it. Took 7 months to get it in the dry.
 

Agent Smith

Hack of all trades
Local time
9:01 AM
User ID
5180
Joined
Jan 28, 2018
Messages
3,168
Reaction score
18,933
Location
Northeast ohio
Country flag
I built an 11,000 square foot log home about 20 years ago. It had 13 tractor-trailer loads of logs in it. Took 7 months to get it in the dry.
That's a biggun log cabin....mmmhmmmm. After 7 months, I would need a break from seeing logs for awhile lol
 

Mastermind

Chief Cat Herder
Staff member
Yearly GoldMember
Local time
8:01 AM
User ID
4
Joined
Dec 3, 2015
Messages
52,547
Reaction score
350,003
Location
Banner Springs Tennessee
Country flag
Logs ready scribed and fit and you reassembled? Or you did the whole fit up?

9 5/8" tall. Cut on two sides. Peeled on the other two. Various widths. Full round corners, had the be fitted together. Log joists and beams for second floor with tongue and groove ceilings. Floating above that was an engineered floor system. Ridge poles were various sizes of band sawn beams with logs for rafters, and valleys. Tongue and groove ceilings again, and I joists above that for rafters. It was a hell of a project.
 

Mastermind

Chief Cat Herder
Staff member
Yearly GoldMember
Local time
8:01 AM
User ID
4
Joined
Dec 3, 2015
Messages
52,547
Reaction score
350,003
Location
Banner Springs Tennessee
Country flag
That's a biggun log cabin....mmmhmmmm. After 7 months, I would need a break from seeing logs for awhile lol

I was sick of it by the time it was in the dry.

lol the whole job of taking axles out and stuff

Oh....yeah.

I need a better place to work.
 

timg

Supporter of Cat Eating Komatsu Machinery
GoldMember
Local time
9:01 AM
User ID
8928
Joined
Mar 7, 2019
Messages
4,427
Reaction score
24,215
Location
Keystone State West
Country flag
Doesn't need to to make power. Big gov going stamp that *s-worde out one day.
They have already started with some of the tuner shops and EGR deleters. Not much of a way around it as all titled vehicles are blanketed by EPA.
 

timg

Supporter of Cat Eating Komatsu Machinery
GoldMember
Local time
9:01 AM
User ID
8928
Joined
Mar 7, 2019
Messages
4,427
Reaction score
24,215
Location
Keystone State West
Country flag
Got the first rafter or header or whatever you want to call it log up tonight across 3 poles. 2 more to go
View attachment 302866
Long black timber screws or old school wood pegs?? I have trouble with dimensional lumber let alone round timber. That's a challenge agent. Rock on!!
 
Top